EMT Practice Test

1. Question Content...


Question List

Question1: Refer to the exhibit.

A customer needs to create a proposal for a full wireless solution for a customer The customer has indicated that the MCs will connect to Aru&a CX Switches at the core and the APs will connect to PoE-i- switches at the edge. The customer requires that the wireless solution support at least 50 Mbps concurrently per AP. The architect has created a BOM tor a Mobility Master (MM), two MC 721os, and 400 AP-535S. me exhibit snows this BOM.
Which components has the architect forgotten?

Question2: The architect plans to recommend an upgrade to Aruba CX switches
What is one requirement for the new solution that justifies this recommendation?

Question3: Refer to the exhibit.

The network architect has created the 60M shown in the exhibit tor a complete new wired ana wireless solution for a customer. This solution the customer wants to discover and manage every component or the network in Airwave, including twins, MCS, APS, and switches.
How many AirWave licenses dees the architect need to add?

Question4: A mall requires a wireless network upgrade to 802 -Max The company that owns the mall wants to provide the APs for the entire mall. However, several of the larger national chain retailers with spaces in the mall want to offer wireless services with their own SSIDs.
These individual retailers also have their own wireless guest services and wireless client devices They have their own corporate infrastructure and want to handle all of this wireless traffic on their own, including terminating the traffic on their own controllers. The mall requires redundancy for its services, out the retailers do not.
Which plan for mobility controllers (MCs) and mobility master (MW) meets the needs of this scenario?

Question5: A customer has multiple medium and large branch sites, eacri of which requires between S ana 16 APs and supports between 200 and 600 wireless clients, Every branch site has an Internet connection, which it uses to reach the central data center. The customer would prefer the WAN links to be optimized in the solution.
Different use cases require SSID's for tunneled traffic from remote sites to central location, traffic that must remain local on the remote site, and traffic which would need to egress out from remote site Internet connection.
Which branch office solution best meets the customer needs?

Question6: What is one benefit that Airwave provides to customers in the 8.x OS network?

Question7: A retailer currently has two redundant ClearPass C2000 0L36O Gen9 hardware appliances and two perpetual 1K Access licenses. The customer uses ClearPass to authenticate employee wireless devices and other corporate wireless devices. ClearPass togs indicate that, peak license usage is currently 1900.
The customer now wants to add a guest access solution. Guests will connect to an open SSiD and be redirected to a portal which they can use to self-register and log in. The customer anticipates that up to f 550 guest devices will connect at the same time.
The customer requires the most cost-effective solution that will meet the requirements. What should the network architect recommend for this solution?

Question8: Refer to the exhibit.

The exhibit shows the current AP deployment In a warehouse that stores frozen food goods:
* APs are mounted on the ceiling, which is 15 feet (4.6 m) high.
* Shelves are 12 feet (3.7 m) high and are typically fully stocked.
This customer indicates that their current wireless performance is inadequate.
What should the network architect include in the new solution to resolve this issue?

Question9: Match each hospital room with a potential issue for the AP design (Each match will be used once. )

Question10: in which scenario do Aruba CX 6400 Series switches, but not Aruba 6300M Series switches, meet the needs Tor a wired upgrade?

Question11: A customer has an existing Aruba wireless solution at their campus. This solution is shown in the exhibit.
The customer now wants to enhance seamless roaming and failover across the solution. The customer wants the least expensive solution that still meets the needs.
Which figure shows the correct changes to the solution to meet the new needs?
A)

B)

C)

D)

Question12: A network architect plans to propose a virtual Mobility Master (VMM) tor a new solution. The solution will support up to 4.800 wireless client devices and include:
* two Virtual Mobility controllers (VMCs) in a cluster
* 180 APs
Which licenses should the architect propose?

Question13: An indoor sports stadium has 5.000 seats in two rings:
* The stadium has a ceiling height of 72 feet (22 m).
* There is a catwalk around the perimeter of me stadium that is 54 feet (13 m) from me floor.
* There are two scoreboards at either end of the stadium
* The construction of the stadium is concrete and steel.
The customer has indicated a preference for overhead coverage, and the wireless network should support 3500 concurrent clients. The architect plans to install the APs on the catwalk to service sections of the floor below Which type or antennas are recommended for the APS that provide the overhead coverage?

Question14: Refer to the exhibit.

This warehouse has the dimensions shown in the exhibit. The warehouse is 20 feet (6 m) high up to a steel railing on the celling. The shelves are about 16 feet (5m) high, and they hold large containers filled with fluid and metal equipment.
The customer needs consistent wireless coverage throughout the warehouse, mostly to support the tablets that employees use to run Inventory tracking and other applications. The warehouse staff works in shifts of 20.
The architect has selected AP-515S. About how many APs should the architect propose?

Question15: A customer requires new MCs for a large multi-site network with about 600 AP-535S ana 30,000 wireless clients. The customer requires redundancy for the MCs, with each MC being able to handle the full toad in a failover situation The network should be able to sustain the loss of a controller with stateful failover within seconds. It should be able to undergo software upgrades without downtime.
The architect has recommended two 7240XM MCs. The customer points out that 7220 MCs can support their requirements and wonders why the architect recommended me 7240XMS.
What should the architect explain?

Question16: Refer to the exhibit.

A customer needs a wireless network upgrade and has these requirements.
- Support any applications used on a wired connection
- Support up to 2500 wireless clients
- Support seamless roaming from floor to floor and building to building
- Continue to function seamlessly if one controller fails
The architect has designed the logical infrastructure for the network as shown in the exhibit Which change should the architect make to belter meet customer requirements and besl practices?

Question17: A customer has a large network, which includes a main site and many branch sites. The network has a total of about 10.000 wireless devices at the main site and 15,000 wireless devices total at branches.
To fulfill the requirements for a wireless network upgrade, the architect plans to propose;
* 2 7205 MCs at the main site
* 2 7210 MCs at the main site
* 10 7030 MCs at branch sites
* 200 RAPs at branch sites
* 500 CAPS at the main site
* 300 CAPS at branch sites
What is the most cost-effective Mobility Master solution that meets the requirements'?

Question18: What is one additional benefit trial Foundation Care gives beyond ire included warranty in Aruba products?

Question19: A customer has an Aruba solution with APs, MCs, and an MM The customer also uses AirWave and ClearPass. The customer wants to add Aruba CX Switches, which use per-user tunneled node, to the solution.
How should the Aruba CX Switches integrate with the existing solution in order to determine when to tunnel device traffic to MCs?

Question20: An archinect needs lo plan a Mobility Master (MM) solution for a customer Requirements include:
* redundancy for the MM
* redundancy for the MCS (seamless failover if up to one fails)
The wireless network consists of
* total APs - 300
* total wireless devices = 20,000
* total MCs = 10
The customer wants the most cost-effective plan that meets me requirements.
Which plan for MMs should the architect select?

Question21: An indoor basKetbaiI stadium has 5.000 seats in two rings:
* The stadium has a ceiling height of GO feet (18 m).
* There is a catwalk around the perimeter of the basketball court, between the court and the seating areas.
* This catwalk is 40 feet (12 m) from the floor.
* There are two scoreboards at either end of the stadium.
* The construction of the stadium is concrete and sleet.
The customer does not want an under-seat, picoceli deployment.
Which AP model is appropriate to provide coverage in the main stadium bawl?